According to the protocol signed, a wave energy facility of up to 77 megawatts (MW) will be established in Ordu. Estimated $150 million power plant, Turkey’s first grid-connected wave power plant, and the world’s largest wave power plant While he was the Minister of Energy and Natural Resources, Ordu Metropolitan Municipality Mayor Dr. Mehmet Hilmi